Attractions

Bogatyr Access Komyr Bogatyr Access Komyr

Cut a large unit capacity was built in the world for the first time. In this regard, "The Hercules" in 1980 was included in the Guinness Book of Records (during the operation produced more than 1 billion tons of coal), its production capacity to 50 million tons of coal per year. The first stage of the cut was put into operation in November 1970, and in December 1983 until "The Hercules has reached its design capacity ahead of schedule.

Reviews (0) Views: 20390

Read more
Eurasian Energy Corporation Eurasian Energy Corporation

Eurasian Energy Corporation - an enterprise of the XXI century. Here is the first time in Kazakhstan was used streaming technology of coal mining. Production capacity of the cut - 30 million tons of coal per year. In 2000, the cut was 15 years old, during its operation produced more than 240 million tons of coal. Coal mining is carried out rotary excavator CPC (K) -2000 with a capacity of up to 5000 tons of coal per hour. For transportation of coal used by high-performance conveyor belts, the total length of more than 17 km.

Reviews (1) Views: 18720

Read more
Памятник жертвам политических репрессий Памятник жертвам политических репрессий

В 30-е годы в Экибастуз было сослано свыше 5 тыс. репрессированных. В основном это представители интеллигенции, партийные работники, кадровые офицеры

Reviews (0) Views: 14062

Read more
Ekibastuz GRES-2 Ekibastuz GRES-2

The unique pipe of station in height of 420 meters was included into The Guinness Book of Records.Start-up of the first block of a state district power station-2 took place in December, 1990, and the second power unit has been started on December, 22nd, 1993. This day became the important event in history not only stations, but also city – the president of Republic Kazakhstan N.A.Nazarbaev took part in its start-up. Simultaneously with station the settlement named Solar has been erected. Ekibastuz state district power station-2 develops the electric power from ekibastuz coal two power units on 500 MVt, and it has the established capacity - 1000 MVt. Energy of a state district power station-2 is intended for maintenance of the north of Kazakhstan and covers 15 % of republic energy consumption. Consumers are enterprises not only Kazakhstan, but also Russia. Among them Republic State Enterprise "Kazakhstan Temir Joly", cosmodrome "Baikonur", the channel Irtysh-Karaganda.

Reviews (1) Views: 22705

Read more
Results: 1 - 4 / 4
< Back | 1 | Forward >

Choose a region or a city:

Book a room

Book

City Guests
Check-in